Nan has been taking pictures of the progress… although it’s slow, it is steady. We have a functional bathroom right now, Greg, our contractor has about a day of work left. Here are some pictures that we’ve taken… first of the demolition and then some of the work during the rebuild.
Demolition Photos.
Rebuild Photos
Will post pics of the finished product soon.
Just when you think you’re starting to get things where you think you want them, something else goes south.
We were NOT planning to re-do the bathroom… but guess what… we are. Turns out the hole in our tub where the drain is was severely rusted through to the point where water was leaking under the tub. Changing the tub was the only permanent solution. Changing the tub out means we had to remove the tile around the tub… and why stop there?
So… we’re having a new bathroom installed. I did the demolition work, but we hired out the job of rebuilding, and plumbing.